“Had a fantastic expert service at very short notice. Will definitely use again.”
Commercial EICRin Worcester
The same test schedule as a house, against an installation twenty times the size, on a supply you cannot switch off during opening hours. What separates a useful commercial report from a worthless one is how much of it was actually tested.




5.0 on Google from 11 reviews· Phone answered 24 hours
Commercial EICR
When a commercialproperty needs testing
The duty to maintain is in the Electricity at Work Regulations. The interval is not, so it depends on the environment.
- Five years is usual for offices and shops
- Three years for wet, dusty, hot or heavily used premises
- On change of tenancy or change of use
- Before a lease ends, where the lease requires it
- After a fit-out, so you know what changed
- When an insurer or a landlord asks for a current report

Book your fixed wire testing
We will plan it round your trading hours.
Get a quote
Request a Free Quote
Send us a few details and photographs of the job and we will come back to you with a fixed written price. The more you can tell us, the more accurate it is.
- Free written quotes
- Phone answered 24 hours
- Photos help us price it accurately
- Fixed price before we start
Book your fixed wire testing
Or ring and talk it through. No charge for the call.
Our process
How a commercial EICR works
Staged so the business keeps running, reported so you can budget.
- 1Scope the siteHow many boards, how many circuits, what cannot go off.
- 2Test in stagesOut of hours where a circuit cannot be isolated in trading time.
- 3Coded reportC1, C2, C3 and FI, with what each means for the site.
- 4Remedials pricedSeparately, so C3 items can sit in next year's budget.

Why it is worth doing
A report you canput in a budget
What the codes mean when the building is a business.
- C1 made safe on the dayDanger present, dealt with before we leave.
- C2 priced clearlyWith what it takes to clear it.
- Tested around tradingOut of hours where it has to be.
- The document on fileFor your insurer, your landlord or your lease.
Book your fixed wire testing
Send photos with it and the price comes back faster.
Everything to know about commercial eicr in Worcester
Sampling, the codes, and the duty behind it
Nobody tests every accessory in a commercial building. There may be several hundred and the place has to reopen. So the inspection samples, and the report has to say what the sample was. A report on a forty-circuit installation that does not state the percentage inspected is a report you cannot rely on, because satisfactory against five per cent and satisfactory against fifty per cent are different statements. The sample widens where findings justify it, which is the mechanism that stops a light sample hiding a systemic problem.
The coding is identical to a domestic report, and so is the conclusion. C1 is danger present and is made safe before we leave. C2 is potentially dangerous. C3 is an improvement recommended. FI means something needs further investigation. Any C1, C2 or FI makes the report unsatisfactory; C3 items alone do not. On a large installation you should expect a list, and the useful question is not how long the list is but how the items are coded and where they are.
Behind the report sits the Electricity at Work Regulations 1989, which require whoever controls the installation to maintain it so far as is reasonably practicable to prevent danger. That duty does not name an interval. Five years is the common one for offices and shops, three for anything wet, dusty, hot or heavily used, and your lease or your insurer may impose its own regardless. The report states the date it recommends for the next one, based on what it actually found rather than on a default.
The practical constraint is isolation. Insulation resistance testing needs the circuit dead, so the work is planned around your trading: board by board, out of hours, with a written isolation plan so the tills, the server and the refrigeration are not on a board that goes off without warning. Tell us what must never lose power and it gets designed around rather than discovered.
What a commercial inspection includes
The report, the schedule of results, and a remedial price you can put in a budget.
- Every distribution board, sub-main and final circuit recorded
- Sampling percentage stated on the report, widened where findings justify
- Full instrument test schedule, readings attached rather than summarised
- Observations coded C1, C2, C3 or FI, each located on a board and way
- Anything coded C1 made safe before we leave the building
- Written isolation plan agreed before the day
- Out-of-hours working so the building keeps trading
- Remedial work priced line by line, so it can be staged over a budget
How a commercial EICR runs
Walk the site
Boards, circuit count and what must never lose power. That sets the sample and the hours.
Isolation plan
Agreed in writing before the day, board by board, so nothing critical goes dark unannounced.
Inspect and test
Out of hours, board by board, with readings written down as they are taken.
Report and price
Coded observations, the sampling stated, and remedial work itemised so it can be staged.
Commercial inspection across Worcester and Worcestershire
Retail and offices in Worcester, the industrial units at Droitwich Spa, hotels and guest houses in Malvern, and the packhouses and growing units around Evesham, which are the ones most often on a three-year interval because of the environment. Also Pershore and Stratford-upon-Avon. Remedial work is ordinary commercial work; where a report faults the emergency lighting rather than the wiring, that sits with commercial lighting. Landlords letting residential property need the domestic regime instead, which is a different legal duty entirely.
Our reviews
Rated 5.0 on Google
“Quick service. Friendly and efficient. Highly recommended”
“I’ve worked with SEE Electrical across multiple retail and commercial projects, and the quality of their work and attention to detail have consistently been excellent. The team is professional, reliable and clearly takes pride in what they deliver. I look forward to working with them again on future projects.”
“I’ve been using SEE to look after my properties and can’t speak highly enough about them. Clean, tidy, reliable and they always go that extra mile.”
“Great electrician — replaced my electric hub quickly and for a reasonable price. Work was clean, fast, and professional. Definitely recommend.”
“Absolutely brilliant service from start to finish. He came out on a Sunday to fit a new socket for me, was extremely professional, friendly and did an amazing job. The work was completed to a really high standard and everything was left neat and tidy. Really appreciate him giving up his Sunday to get the job done. I’ll definitely be using him again in the future and would highly recommend him to anyone looking for a reliable electrician. ⭐⭐⭐⭐⭐”
“Great job and price to fit an EV charger and PIR Highly recommend them. Thanks to Laurence for carrying out the work. Great job”
“Friendly reliable service”
“New immersion timer sorted and fitted after I had difficulties finding an electrician to diagnose the problem. Great job done.”
“Amazing service very prompt and professional no job too small highly recommend”
Frequently asked questions
Commercial EICR: Your Questions
How often does a commercial property need an EICR?
Five years is usual for offices and shops, three for wet, dusty, hot or heavily used environments. There is no single statutory interval: the Electricity at Work Regulations 1989 require maintenance to prevent danger, and the interval follows the risk. Your lease or insurer may set a shorter one, and the report names the date it recommends.
Do you have to switch the whole building off?
No. It is done board by board to a written isolation plan agreed beforehand, usually out of hours. Tell us what must never lose power, the tills, the server, the refrigeration, and it is designed around rather than discovered on the night.
What percentage do you actually inspect?
It depends on the size and condition of the installation, and whatever it is, it is stated on the report. That number matters: satisfactory against five per cent and satisfactory against fifty per cent are different statements. The sample widens where findings justify it.
Our report came back unsatisfactory with thirty items. Is that bad?
Not necessarily. On a large installation a long list is normal and what matters is the coding. Thirty C3s is a satisfactory report and a maintenance plan. One C2 among them is what makes it unsatisfactory. Read the codes before you read the length.
Can the remedial work be staged?
Usually, and it is priced line by line so it can be. C1 items are made safe on the day regardless. C2 items are the ones to programme first because they are what the report turns on. C3 items can sit in next year's budget.
Our landlord says it is our responsibility. Is it?
It depends on the lease, and leases differ. The regulations put the duty on whoever controls the installation, which in a full repairing lease is usually the tenant and in a serviced building is usually the landlord. Check the lease and, if it is ambiguous, get it agreed in writing before the inspection rather than after it.
