Fuse Board Upgradesin Worcester

A board change is a day's work and two decisions: what the enclosure has to be made of, and whether each circuit gets its own protective device or shares one. Both are worth understanding before you compare two quotes.

Fixed pricein writingPhone answered24 hours5.0 on Google11 reviewsBased inWorcester WR1

5.0 on Google from 11 reviews Phone answered 24 hours

Fuse board upgrades

When a boardneeds replacing

Age on its own is not a reason to change a board. These are the things that are.

  • Rewirable fuses, or cartridge fuses with no RCD
  • A plastic or wooden enclosure on a board inside the house
  • No RCD protection on sockets, lighting or a shower circuit
  • Breakers that trip and will not stay in
  • Scorching, a burning smell or heat around the board
  • An EICR coding the board itself as C2 or C1
A metal consumer unit with the cover off, breakers and coloured cables visible

Get a price for your fuse board

Send a photo of the board and we will price it.

Get a quote

Request a Free Quote

Send us a few details and photographs of the job and we will come back to you with a fixed written price. The more you can tell us, the more accurate it is.

  • Free written quotes
  • Phone answered 24 hours
  • Photos help us price it accurately
  • Fixed price before we start

Optional, and it helps a lot. Up to 10 files, photos to 15MB, video to 40MB.

    Thank you. We will call you back shortly. If you would rather not wait, ring or message now. Call 07851 872110

    Get a price for your fuse board

    Or ring and talk it through. No charge for the call.

    Our process

    How a board change works

    Usually one day, and you know the price before we start.

    1. 1Tell us what you haveA photo of the open board and the meter is often enough to price it.
    2. 2We check the supplyMain fuse rating, earthing arrangement and what each circuit actually feeds.
    3. 3A fixed written priceIncluding the tests and the certificate, with nothing added afterwards.
    4. 4Swap, test, labelPower off for the day, every circuit tested, and the board labelled before we leave.
    A metal consumer unit with the cover off, breakers and coloured cables visible

    Why it is worth doing

    The protectionthe old board never had

    What a modern consumer unit actually changes.

    • 30mA RCD protectionOn the circuits the regulations require it on.
    • One circuit trips, not the houseRCBOs mean a fault takes out one circuit.
    • A metal enclosureAs required for a board inside a domestic property.
    • Certificate and notificationTested, certificated and notified to building control.

    Get a price for your fuse board

    Send photos with it and the price comes back faster.

    Everything to know about fuse board upgrades in Worcester

    The two decisions, and the thing nobody warns you about

    Enclosure first, because there is no choice in it. Regulation 421.1.201 requires a consumer unit in a domestic property to have a non-combustible enclosure, or to sit inside one. In practice that means steel. It exists because a loose connection inside a plastic board can start a fire the board then feeds rather than contains. If a quote has you a plastic unit in a house, that is the line to query.

    Then the protection, which is where quotes diverge and where the money is. A split-load board has two 30mA RCDs with the circuits divided between them. It satisfies the regulations and it is cheaper. It also means one fault on one circuit takes out everything on that half of the board, so a failing freezer in the garage can trip the lights upstairs and you find out on your return from holiday. An all-RCBO board gives every circuit its own combined device. A fault drops that circuit and nothing else, and it tells you immediately which circuit is at fault, which turns a diagnostic visit into a two-minute conversation.

    Amendment 2 to the wiring regulations, in force from September 2022, pushed further in that direction. Socket outlets rated up to 32A need 30mA RCD protection, and so do cables buried in a wall at less than 50mm depth, which is most of them. Arc fault detection is required in certain premises, including houses in multiple occupation and purpose-built student accommodation, and recommended elsewhere. Surge protection is assessed rather than assumed, and in an ordinary house you are entitled to decline it once the risk has been explained. Each of those is a line on a quote and each is worth asking about.

    The thing nobody warns you about: a new board tests the old wiring. Modern RCDs detect leakage that the old board simply passed, and circuits that seemed fine for a decade can refuse to energise because the insulation resistance is no longer good enough. That is not damage caused by the board change, it is a pre-existing fault that the old board was not sensitive enough to see. We test the circuits BEFORE quoting so this is a conversation at the quoting stage rather than a surprise at four in the afternoon with your power off.

    What a board change includes

    One day in most houses, and the power back on before we go.

    • Circuits tested before the quote, so surprises happen early
    • Steel enclosure, as Regulation 421.1.201 requires
    • RCBO or split-load, priced separately so you can choose
    • Main earthing and bonding to gas and water brought up to size
    • Every circuit identified and labelled, not left as Circuit 4
    • Surge protection offered and explained, not added silently
    • Full test schedule, Electrical Installation Certificate
    • Notified to Building Control under Part P

    How a board change runs

    Test first

    The existing circuits are tested before anything is quoted, so a failing circuit is priced rather than discovered.

    Fixed price

    In writing, with the enclosure and the device type named and any remedial work itemised.

    Change over

    Power off for most of the day. We tell you the window before the day, not on it.

    Test and certify

    Every circuit tested and labelled, the certificate handed over, the work notified.

    Board upgrades across Worcester and Worcestershire

    Plenty of these follow an EICR that came back unsatisfactory, and plenty more are the first step before an EV charger can have a circuit of its own. The Victorian terraces around Worcester and the older stock in Malvern throw up the most pre-existing faults; the newer estates at Droitwich Spa are usually straightforward, as are Pershore, Evesham and Stratford-upon-Avon. Where several circuits fail their insulation test, a board change is not the answer on its own and we will say so rather than fit one: that is a partial rewire conversation.

    Consumer unit replacement: the same job, the other name

    Consumer unit replacement and fuse board upgrade are the same work. The consumer unit is the box itself, the fuse board is what most people still call it, and a replacement means taking the old one off the wall and fitting a new one with RCBOs on the ways that need them. What decides the price is rarely the board: it is what the tests find behind it. A circuit with poor insulation resistance has to be sorted before it goes on a new board, because a modern device will trip on a fault an old rewireable fuse happily ignored. We test first, quote the board and the remedials separately, and you decide.

    How to tell you need one, and what to settle before we start

    There is no age at which a board automatically needs changing, but there are signs. A board with rewireable fuses, a wooden back or no RCD at all belongs to a different set of rules from the current ones. A board with no spare ways forces every new circuit onto a spur or a shared way. Any board that trips and will not reset, or that shows scorching around a terminal, is telling you now. And an inspection report that has come back with C2 codes against the board itself settles it. Before we start, three things are worth deciding rather than discovering: whether you want RCBOs on every way or a split load, because the first costs more and means one fault takes out one circuit instead of half the house; where the board will live, since moving it is a bigger job than replacing it; and what happens if the tests find a circuit that will not sit happily on modern protection, because that is the commonest reason a board change grows.

    Our reviews

    Rated 5.0 on Google

    5.0 from 11 Google reviews View all reviews on Google
    5/5
    “Had a fantastic expert service at very short notice. Will definitely use again.”
    Colin Thomas Google review · September 2026
    5/5
    “Quick service. Friendly and efficient. Highly recommended”
    John Wright Google review · September 2026
    5/5
    “I’ve worked with SEE Electrical across multiple retail and commercial projects, and the quality of their work and attention to detail have consistently been excellent. The team is professional, reliable and clearly takes pride in what they deliver. I look forward to working with them again on future projects.”
    Callum Smith Google review · September 2026
    5/5
    “I’ve been using SEE to look after my properties and can’t speak highly enough about them. Clean, tidy, reliable and they always go that extra mile.”
    Adam Price Google review · September 2026
    5/5
    “Great electrician — replaced my electric hub quickly and for a reasonable price. Work was clean, fast, and professional. Definitely recommend.”
    Dee Ba Google review · September 2026
    5/5
    “Absolutely brilliant service from start to finish. He came out on a Sunday to fit a new socket for me, was extremely professional, friendly and did an amazing job. The work was completed to a really high standard and everything was left neat and tidy. Really appreciate him giving up his Sunday to get the job done. I’ll definitely be using him again in the future and would highly recommend him to anyone looking for a reliable electrician. ⭐⭐⭐⭐⭐”
    Tom Godber Google review · August 2026
    5/5
    “Great job and price to fit an EV charger and PIR Highly recommend them. Thanks to Laurence for carrying out the work. Great job”
    Philip Sanders Google review · August 2026
    5/5
    “Friendly reliable service”
    Chris Dixon Google review · August 2026
    5/5
    “New immersion timer sorted and fitted after I had difficulties finding an electrician to diagnose the problem. Great job done.”
    Martin Dufty Google review · July 2026
    5/5
    “Amazing service very prompt and professional no job too small highly recommend”
    Tracey Nash Google review · July 2026

    Frequently asked questions

    Fuse Board Upgrades: Your Questions

    Do I have to have a metal fuse board?

    In a house, yes. Regulation 421.1.201 requires a non-combustible enclosure, which in practice means steel, or the board has to be inside a non-combustible enclosure. A plastic consumer unit already fitted is not illegal and does not have to be ripped out, but it is not what goes back in.

    RCBOs or a split-load board?

    Split-load is cheaper and meets the regulations. RCBOs give every circuit its own device, so a fault drops that circuit alone instead of half the house, and you can see at a glance which circuit failed. If the property is let, or has a freezer, a home office or anyone working from home, the difference stops being theoretical.

    How long will my power be off?

    Most of a working day for a straightforward house. We give you the window before the day rather than on it, and the power is back on before we leave. If a circuit fails its tests and cannot safely be re-energised, you will know that afternoon and we will tell you what it needs.

    Why did my new board start tripping when the old one never did?

    Because the old one could not see the fault. A modern RCD trips on leakage measured in milliamps, and an old board without one passed that leakage for decades. The fault was already there. It is usually a shower element, an immersion heater, an outside light letting in water, or damp getting into a circuit somewhere.

    Is a board change notifiable?

    Yes. Replacing a consumer unit is notifiable building work in England and Wales, so it is notified and you get the certificate and the notice. That paperwork is what a buyer's solicitor asks for later.

    Do I need surge protection?

    It depends on what the loss would cost you and how your supply is arranged. In an ordinary house you are entitled to decline it once the risk has been explained. Where there is a lot of connected equipment, a home office or an air source heat pump, it is usually worth the line on the quote. We will price it separately either way rather than bury it.

    Can you just add an RCD to my existing board?

    Sometimes, and we will tell you when that is the straight answer rather than selling you a board. If the existing enclosure is sound, the circuits test well and the problem is simply a lack of RCD protection, adding one can be proportionate. If the enclosure is plastic, the fuses are rewireable, or the thing is full, it is a false economy and you will be paying twice.

    GET IN TOUCH

    Need an electrician in Worcesteror the surrounding areas?

    Whether it is a rewire, new sockets, lighting, an EV charger or a fault that needs sorting today, get in touch for a free, no-obligation quote.

    Call Us07851 872110Our AreaWorcester & Surrounding Areas
    Opening HoursOpen 24 hours, seven days a week
    Call 07851 872110 Free quote