“Had a fantastic expert service at very short notice. Will definitely use again.”
Kitchen & Bathroom Electricsin Worcester
Two rooms with more rules attached than the rest of the house put together, for opposite reasons: one is full of water, the other is full of load. Getting either wrong is expensive once the tiles are on.




5.0 on Google from 11 reviews· Phone answered 24 hours
Kitchen and bathroom electrics
What these roomsneed that others do not
Kitchens and bathrooms have their own rules, because water and heavy appliances both live there.
- Zone-correct fittings in a bathroom, rated for where they sit
- Supplementary bonding tested and verified rather than assumed
- Dedicated circuits for the oven, hob and any high-load appliance
- Fire-rated downlights where the ceiling is a fire barrier
- Under-cabinet lighting on its own switched supply
- Extractor fans with the right isolation and overrun

Get a price for your kitchen or bathroom
Zone-correct wiring, priced before we start.
Get a quote
Request a Free Quote
Send us a few details and photographs of the job and we will come back to you with a fixed written price. The more you can tell us, the more accurate it is.
- Free written quotes
- Phone answered 24 hours
- Photos help us price it accurately
- Fixed price before we start
Get a price for your kitchen or bathroom
Or ring and talk it through. No charge for the call.
Our process
How kitchen and bathroom work runs
Planned around the fitters, so nothing gets buried before it is tested.
- 1Plans or photosThe layout and the appliance list tell us the circuits.
- 2First fixCables run before the units and boards go in.
- 3Second fixAccessories fitted once the room is built.
- 4Tested and certificatedTested, recorded and notified where the work is notifiable.

Why it is worth doing
Wired for the room,not just the appliance
What the regulations actually require in these two rooms.
- Zone-correct in bathroomsFittings rated for where they are installed.
- Circuits for the appliancesOven, hob and high-load appliances separated.
- Bonding verifiedTested rather than assumed either way.
- Notified under Part PNew circuits and bathroom work notified.
Get a price for your kitchen or bathroom
Send photos with it and the price comes back faster.
Everything to know about kitchen & bathroom in Worcester
Bathrooms: the zones decide everything
A room containing a bath or a shower is divided into zones and the zone decides what may be installed. Zone 0 is inside the bath or the shower basin itself, needs IPX7 protection, and takes nothing but extra-low voltage. Zone 1 is directly above it to two and a quarter metres from the floor and needs IPX4, or better where a jet is used for cleaning. Zone 2 extends six hundred millimetres beyond zone 1 and also needs IPX4. Beyond the zones there is no specific IP requirement, but every circuit in the room needs 30mA RCD protection regardless.
Socket outlets are the rule people break. Ordinary sockets must not go within two and a half metres horizontally of the zone 1 boundary, which in most domestic bathrooms rules the room out entirely. A shaver supply unit to the right standard is the exception, and it is why they exist. If somebody offers you a normal socket in a bathroom because your electric toothbrush needs one, that is the conversation to stop.
Supplementary bonding is the one that saves money when it is assessed properly. The wiring regulations allow it to be omitted where every final circuit in the location has 30mA RCD protection, all extraneous conductive parts are connected back to the main earthing terminal by main bonding, and the installation is in good order. In a house with a modern board that is usually satisfied, and the alternative is lifting a bathroom floor to run bonding conductors. It has to be verified rather than assumed, and that verification is a test, not an opinion.
Kitchens are a different problem: load and layout. The cooker gets its own circuit sized with diversity applied, because a cooker rated at forty-odd amps never draws it all at once. Built-under appliances get a switched fused connection above the worktop, so a leaking dishwasher can be isolated without pulling the units out. And one piece of paperwork worth knowing: in England a bathroom is a special location and electrical work in one is notifiable, whereas kitchens stopped being notifiable in their own right in 2013. A new circuit is still notifiable wherever it is. In Wales the older rules still catch kitchens, which matters if you own property across the border.
What this work includes
Designed before the tiler and the fitter arrive, not after.
- Bathroom zones set out on site, with the IP rating for each fitting
- Supplementary bonding tested and verified, not assumed either way
- 30mA RCD protection on every circuit in the location
- Cooker circuit sized with diversity, not by the badge rating
- Appliance isolation above the worktop, reachable without moving units
- Extractor fans with the correct isolation and overrun supply
- Under-cabinet and plinth lighting run before the units go in
- Notified to Building Control where the work requires it
How a kitchen or bathroom job runs
Before the fitter
Positions agreed against the actual unit and sanitaryware layout, on the wall, in pencil.
First fix
Cables run and boxes set while the walls are open and before anything is tiled.
Second fix
Accessories and fittings on once the units and tiling are in, to the zones agreed.
Test and certify
Tested, the certificate issued, and notified where the work requires it.
Kitchen and bathroom work across Worcester and Worcestershire
Refits across Worcester, Droitwich Spa, Malvern, Pershore, Evesham and Stratford-upon-Avon. If the board is old, a new cooker circuit often needs a board upgrade first because there is nowhere to take a protected circuit from. A hob or cooker on its own is a cooker connection, and if the whole house is being done at once it is far cheaper to fold this into a rewire than to bolt it on afterwards.
Kitchen lighting: under-cabinet, downlights and the switching
Kitchen lighting is three jobs, and doing them as one is why so many kitchens end up bright and unpleasant. Task light goes under the wall units, over the worktop where you are actually cutting, and it wants to be a continuous strip or a run of spots rather than one fitting in the middle of the room throwing your own shadow onto the board. Ceiling light is general fill, and in a kitchen it is usually downlights, which have to be fire rated where there is a room above and rated for insulation cover if there is loft over them. The third is anything over an island or a table, which is decorative and wants its own switch. The part people regret skipping is the switching: task, ceiling and feature on one switch means you get all of it or none of it, and a kitchen used at seven in the morning and again at nine at night wants at least two. Dimming is worth deciding before we run the cable rather than after, because a dimmable circuit and a dimmable fitting are two separate choices and both have to be right.
Our reviews
Rated 5.0 on Google
“Quick service. Friendly and efficient. Highly recommended”
“I’ve worked with SEE Electrical across multiple retail and commercial projects, and the quality of their work and attention to detail have consistently been excellent. The team is professional, reliable and clearly takes pride in what they deliver. I look forward to working with them again on future projects.”
“I’ve been using SEE to look after my properties and can’t speak highly enough about them. Clean, tidy, reliable and they always go that extra mile.”
“Great electrician — replaced my electric hub quickly and for a reasonable price. Work was clean, fast, and professional. Definitely recommend.”
“Absolutely brilliant service from start to finish. He came out on a Sunday to fit a new socket for me, was extremely professional, friendly and did an amazing job. The work was completed to a really high standard and everything was left neat and tidy. Really appreciate him giving up his Sunday to get the job done. I’ll definitely be using him again in the future and would highly recommend him to anyone looking for a reliable electrician. ⭐⭐⭐⭐⭐”
“Great job and price to fit an EV charger and PIR Highly recommend them. Thanks to Laurence for carrying out the work. Great job”
“Friendly reliable service”
“New immersion timer sorted and fitted after I had difficulties finding an electrician to diagnose the problem. Great job done.”
“Amazing service very prompt and professional no job too small highly recommend”
Frequently asked questions
Kitchen & Bathroom: Your Questions
Can I have a normal socket in my bathroom?
Almost certainly not. Ordinary socket outlets are not permitted within two and a half metres horizontally of the zone 1 boundary, which rules out most domestic bathrooms completely. A shaver supply unit to the correct standard is the exception and is what that situation is for.
What IP rating do I need for a bathroom light?
It depends where it is. Zone 1, directly over the bath or shower to two and a quarter metres, needs at least IPX4. Zone 2, six hundred millimetres beyond that, also needs IPX4. Outside the zones there is no specific IP requirement, although every circuit in the room needs 30mA RCD protection wherever the fitting is.
Do I need supplementary bonding in my bathroom?
Not necessarily. It can be omitted where every circuit in the room has 30mA RCD protection, all extraneous conductive parts are main bonded back to the earthing terminal, and the installation is sound. In a house with a modern board that is usually the case. It has to be tested and verified rather than assumed, and that test is much cheaper than lifting a tiled floor.
Is kitchen or bathroom work notifiable?
In England, work in a room containing a bath or shower is notifiable because it is a special location. Kitchens stopped being notifiable in their own right in 2013, although any new circuit is still notifiable wherever it is. Wales kept the older rules, so a kitchen there is caught.
Does my cooker need its own circuit?
Usually, and it is sized using diversity rather than the badge rating, because a cooker rated at forty amps never draws forty amps. Some smaller single ovens can run from a suitably rated connection on an existing circuit. Send us the rating plate and we will tell you which yours is.
When should the electrician come, before or after the fitter?
Both, and in that order. First fix goes in before anything is tiled or boarded; second fix happens once the units and sanitaryware are in. Getting the electrician in only at the end is what leads to surface conduit and sockets in the wrong place.
