“Had a fantastic expert service at very short notice. Will definitely use again.”
Commercial EV Chargingin Worcester
Chargers for a staff car park, a customer car park or a fleet. The chargers are the easy part. What decides the job is how much spare capacity your supply has and how far the cable has to travel to reach a bay.




5.0 on Google from 11 reviews· Phone answered 24 hours
Commercial EV charging
What decidesa workplace install
On a commercial site the supply and the groundwork usually cost more than the chargers.
- The spare capacity at your incoming supply
- Whether load management can avoid a supply upgrade
- How far the bays are from the board, and what the cable crosses
- Whether the car park is yours or the landlord's
- Bollard protection and where vehicles actually swing
- Whether you need back-office billing or just charging

Get a price for workplace charging
Tell us how many bays.
Get a quote
Request a Free Quote
Send us a few details and photographs of the job and we will come back to you with a fixed written price. The more you can tell us, the more accurate it is.
- Free written quotes
- Phone answered 24 hours
- Photos help us price it accurately
- Fixed price before we start
Get a price for workplace charging
Or ring and talk it through. No charge for the call.
Our process
How a workplace install runs
Capacity checked first, because it decides everything after it.
- 1Check the capacityWhat the incoming supply has spare at peak.
- 2Design the layoutBays, cable routes, protection and any load management.
- 3A written priceIncluding the groundwork, which is usually the biggest part.
- 4Installed and commissionedTested, commissioned and handed over with the paperwork.

Why it is worth doing
Ducting once,not twice
Why the groundwork decides the cost of the next phase.
- Capacity checked firstBefore anything is promised or priced.
- Spare ducts laidPulling a second cable later costs a fraction.
- Protected and bollardedWhere vehicles actually move.
- Commissioned and certificatedTested, recorded and handed over.
Get a price for workplace charging
Send photos with it and the price comes back faster.
Everything to know about workplace ev charging in Worcester
Capacity first, chargers second
A single three-phase 22kW charge point draws thirty-two amps on each of three phases. Six of them is a serious addition to a building's load, and most commercial supplies were sized for the business rather than for a car park. So the first job is not choosing a charger, it is establishing what your incoming supply actually carries and what your building already uses at its busiest, which usually means metering the load over a week rather than reading the fuse and hoping.
If the headroom is not there, the options are load management or a supply upgrade, and they are very different propositions. Load management shares the available capacity dynamically: eight bays that each charge fast when the car park is empty and share the supply when it is full. For a workplace where cars sit for seven hours, that is nearly always the right answer, because nobody needs a full charge in forty minutes. A supply upgrade means an application to the distribution network operator, a connection offer, a price and a lead time that is measured in months rather than weeks. If your project has a deadline, start that conversation before you order anything.
Then the civils, which is the cost people do not budget for. Getting a cable from a plant room to the far side of a car park means a duct route, and a duct route means digging, reinstating tarmac, and working around drainage you cannot see on a drawing. The single best decision at this stage is to lay more duct than you need. The trench is dug once; pulling a second cable through a spare duct in three years costs a fraction of digging the same ground twice. Bollard mounts suit open bays, wall mounts suit bays against a building, and the choice affects the cable run more than it affects the price of the unit.
Finally, how you get paid or account for it. Staff-only charging can run on an access card. Customer charging needs a back office, a tariff and a payment route, and it is worth deciding whether you are selling electricity or giving it away as a reason to visit, because that changes the hardware. Grant support for workplace charging exists and the schemes change; we will tell you what is open when you ask rather than quote you a figure from a scheme that has since closed.
What a commercial installation covers
Survey and capacity first, written price second, nothing ordered before both.
- Incoming supply and existing demand measured, not estimated
- Load management designed where capacity is the constraint
- Network operator application handled where an upgrade is needed
- Duct routes planned with spare ways for later bays
- Bollard or wall mounting to suit the bay layout
- Back office, access control and tariff set up and handed over
- Bay markings and signage coordinated with your groundworks
- Tested, the certificate issued, and the installation documented
How a car park job runs
Measure the load
Logged over a working week, so the headroom figure is real rather than a fuse rating.
Decide the route
Capacity sharing or a supply upgrade, with the lead time for each stated plainly.
Civils and install
Ducts in with spare ways, cable pulled, units mounted, surfaces reinstated.
Commission
Load management proven under test, back office configured, certification handed over.
Commercial EV charging across Worcester and Worcestershire
Offices and trading estates around Worcester, units at Droitwich Spa, hotels and visitor parking in Malvern, and the larger agricultural sites near Evesham that often already have the three-phase capacity for it. Also Pershore and Stratford-upon-Avon. The board and sub-main work is ordinary commercial work, and staff wanting a charger at home is a domestic install, which is a different calculation entirely.
Our reviews
Rated 5.0 on Google
“Quick service. Friendly and efficient. Highly recommended”
“I’ve worked with SEE Electrical across multiple retail and commercial projects, and the quality of their work and attention to detail have consistently been excellent. The team is professional, reliable and clearly takes pride in what they deliver. I look forward to working with them again on future projects.”
“I’ve been using SEE to look after my properties and can’t speak highly enough about them. Clean, tidy, reliable and they always go that extra mile.”
“Great electrician — replaced my electric hub quickly and for a reasonable price. Work was clean, fast, and professional. Definitely recommend.”
“Absolutely brilliant service from start to finish. He came out on a Sunday to fit a new socket for me, was extremely professional, friendly and did an amazing job. The work was completed to a really high standard and everything was left neat and tidy. Really appreciate him giving up his Sunday to get the job done. I’ll definitely be using him again in the future and would highly recommend him to anyone looking for a reliable electrician. ⭐⭐⭐⭐⭐”
“Great job and price to fit an EV charger and PIR Highly recommend them. Thanks to Laurence for carrying out the work. Great job”
“Friendly reliable service”
“New immersion timer sorted and fitted after I had difficulties finding an electrician to diagnose the problem. Great job done.”
“Amazing service very prompt and professional no job too small highly recommend”
Frequently asked questions
Workplace EV Charging: Your Questions
How many chargers can our supply take?
Nobody can answer that from the outside. It depends on your incoming capacity and what the building already draws at its busiest, which we measure by logging the load over a working week. A fuse rating on its own tells you the ceiling, not the headroom.
What is load management and do we need it?
It shares the available capacity across the bays dynamically, so each car charges fast when the park is empty and they share when it is full. For a workplace where cars sit for seven hours it is almost always better value than upgrading the supply, because nobody needs a full charge in forty minutes.
How long does a supply upgrade take?
Months rather than weeks, because it involves an application to the distribution network operator, a connection offer, acceptance and then their programme. If the project has a deadline, that conversation has to start before anything is ordered.
Can we add more bays later?
Much more cheaply if you plan for it now. The expensive part is the trench, not the cable, so we lay spare ducts while the ground is open. Pulling a second cable through a spare duct in three years costs a fraction of digging the same car park twice.
Can we charge customers for the electricity?
Yes, with a back office, a tariff and a payment route, and that has to be decided before the hardware is chosen. It is worth deciding first whether you are selling electricity or giving it away as a reason to visit, because the two need different units.
Are there still grants for workplace charging?
Schemes for workplace and fleet charging exist and the terms change regularly. We will tell you what is actually open when you ask rather than quote a figure from one that has closed. Do not let a grant decide the design: the capacity work has to be right either way.

